A backlog can contain criteria that sound sensible but have no clear connection to what users said. When the source is unclear, a team may treat an assumption as a user need—and build a condition that users never asked for and the team has not validated.
TL;DR
- A criterion is not user evidence just because it uses user-centered language.
- Watch for missing sources, interpretations written as facts, and specific conditions with no stated basis.
- Trace each criterion to a source statement or other constraint, then label what is evidence, what is interpretation, and what remains an assumption.
- A source can support an interpretation without proving it is the right solution. Validate consequential inferences before treating them as settled requirements.
Warning signs that a criterion may be an assumption
These signals do not prove a criterion is wrong. They show where its basis needs to be made clear.
No one can identify the source
If the team cannot point to an interview, support conversation, observation, agreed constraint, or other relevant source, the criterion may have been added during drafting rather than established by evidence.
A vague attribution—“users need this,” for example—is not enough to trace the claim. The team should be able to identify where the need came from and what was actually said or observed.
The criterion adds a specific solution the user did not describe
Users often describe a difficulty or outcome, not the interface, feature, or technical condition that should address it. A criterion can quietly turn the team’s proposed solution into something attributed to users.
For example, a user who says, “I can’t tell whether an invoice has been paid without opening each one,” has described a problem. Requiring a dashboard to refresh every ten seconds adds a particular implementation condition. That condition may be appropriate, but it needs its own rationale; the user’s statement alone does not establish it.
A reasonable inference is written as a confirmed need
Teams must interpret evidence to design products. The warning sign is not interpretation itself; it is losing the distinction between what a user said and what the team inferred.
A criterion such as “A user can see an invoice’s payment status in the list without opening its details” could be a reasonable response to the example statement. It is still a proposed interpretation of the desired experience. Record that relationship and validate it when the decision matters.
The criterion contains ungrounded precision
Numbers and conditions can make a criterion look testable while hiding an unsupported assumption. Look closely at response times, thresholds, percentages, deadlines, user roles, and edge cases. Ask where each value or condition came from: user evidence, a technical limit, a policy, or a team decision?
A precise criterion can be useful without coming from a user. The problem is presenting its source or status inaccurately.
A proposal or open question appears as an accepted requirement
A suggestion made in a discussion is not automatically an agreed need. Nor does a draft’s presence in a backlog establish that a stakeholder accepted it. Check whether the source records a proposal, a decision, a commitment, or an unresolved question. Keep the status visible when it is not settled.
Trace a criterion without confusing evidence and interpretation
For any criterion that could affect scope, design, or testing, write down four things:
| Check | What to record |
|---|---|
| Criterion | The behavior or condition the team plans to test. |
| Source | The relevant statement, observation, constraint, or decision, with enough context to find it. |
| Relationship | Whether the criterion repeats the source, interprets it, or comes from another rationale. |
| Status | Whether it is supported, needs validation, or remains an open question. |
Then ask: Does the source actually support this condition, or does it support only the broader problem? If it supports only the problem, keep the proposed solution labeled as an interpretation until the team has a reason to accept it.
For example:
| Criterion | Source and relationship | Status |
|---|---|---|
| Show payment status in the invoice list. | Interpreted from a user’s statement that they must open each invoice to find its status. | Proposed; validate whether this solves the problem. |
| Refresh the dashboard every ten seconds. | No supporting source or technical rationale recorded. | Assumption; investigate before treating as a requirement. |
Not every acceptance criterion must come directly from a user statement. Technical constraints, policy, accessibility needs, and product decisions can also justify conditions. Record those sources accurately rather than attributing them to users.
Retrieve the source when the summary is not enough
A short research summary may omit the detail that would clarify a criterion’s scope or meaning. If the relevant interview or discussion was captured in Hemory, its transcript-based Q&A can help retrieve information from conversations, including across sessions. That can reduce the work of searching through discussions or relying on a summary alone.
Retrieved conversation content can help locate what was said; it does not determine whether a criterion is a valid interpretation, establish team approval, or detect every unsupported requirement. If the source is unavailable or the statement is ambiguous, consult another record or ask a focused follow-up question. Do not fill the gap by guessing.
What to do when a criterion has no clear basis
Do not automatically delete a criterion just because its source is missing. First identify what kind of support it needs. It may reflect a design proposal, a technical constraint, or a genuine user need whose evidence has not been linked. Mark the gap and find the appropriate source or decision-maker.
If the basis cannot be established, keep the criterion as an explicit assumption or open question. That gives the team a chance to validate or revise it before treating it as a user requirement. A useful review outcome is not merely a list of criteria; it is a clear distinction between evidence, interpretation, and what still needs a decision.
FAQ
Does every acceptance criterion need to quote a user directly?
No. Criteria can also come from technical, legal, accessibility, or product constraints. The important thing is to identify the actual basis and avoid presenting a team decision or inference as something users explicitly requested.
If a criterion is traceable, does that mean it is correct?
No. Traceability shows where the criterion came from and how it relates to its source. The team may still need to validate its interpretation, feasibility, scope, or acceptance.
What if no one can find the original statement?
Treat the criterion’s user-evidence link as unresolved. Search relevant records or ask for clarification; if the criterion has another rationale, document that instead. Do not convert an unverified assumption into a confirmed user need by repeating it in the backlog.
When reviewing requirements, start with the criteria that could change scope or lead to consequential work. Ask what supports each one, preserve the difference between evidence and interpretation, and make unresolved assumptions visible before the team builds against them.