How to Separate Decisions from Assumptions in AI-Drafted Requirements

Download Hemory
On this page

A PRD drafted from several product conversations can sound more settled than the evidence behind it. A suggestion may become a requirement, an assumption may read like an agreed fact, or a conditional decision may lose its condition. You can reduce that risk by asking a connected AI agent to label the evidence and keep its sources visible—then reviewing the few distinctions that affect what the team builds.

TL;DR

  • Give the agent the current product goal and ask it to retrieve relevant conversations already captured in Hemory and accessible through the supported connection.
  • Label each item as discussed, proposed, agreed, or unresolved. Track assumptions separately; they are interpretations, not evidence of agreement.
  • Ask for a source reference when the agent can identify one. If it cannot, have it say so rather than inventing a quote, date, speaker, or decision.
  • Review wording, scope, conditions, and approval yourself. A draft is not a team decision or an approved PRD.

Start with the evidence the agent can access

The agent can only work from information available through its connection and any current material you provide. If the relevant conversations were captured in Hemory and are accessible to that agent, it can retrieve context without requiring you to summarize every discussion first. Hemory’s public Features page describes transcript-based, multi-turn Q&A across conversations and lists MCP access for named agents; a listing does not verify every client’s setup, permissions, or exact behavior (Hemory Features).

State the product goal, audience, and current scope in your request. Add a current brief or other document if the agent cannot access it through the connection. You do not need to build a complete chronology in advance. If an important point has no accessible record, supply it from another source or ask a focused follow-up; the agent cannot recover an uncaptured exchange.

Give each item a status—and keep assumptions separate

Use statuses to distinguish what the conversations establish from what still needs a decision. Apply one primary status to each requirement or decision record, and preserve any condition that changes its meaning.

StatusUse it whenDo not treat it as
DiscussedA point was mentioned as context, a concern, or a question, with no clear proposal or agreement.A decision or commitment.
ProposedSomeone suggested an option, requirement, or change, but the available evidence does not show it was accepted.An approved requirement.
AgreedThe relevant decision process shows the point was accepted within its stated scope. Preserve any condition or limitation.Proof that the work is complete or the PRD is approved.
UnresolvedThe evidence conflicts, leaves a material part unclear, or does not establish whether a decision was made.Proof that nobody ever decided.

An assumption is a separate field, not a status. It records an interpretation the draft would need in order to proceed. For example, if the conversation says a feature should support “large teams” but does not define a team size, a numeric threshold would be an assumption—not an agreed requirement.

Keep conditions attached to the item they qualify. If a team accepted a change only after a prerequisite is met, record the agreement and its condition. Do not turn the condition into an unconditional commitment or mark the entire item unresolved when only one detail is still open.

Use a prompt that asks for evidence before polished prose

For a supported connected AI agent, adapt this instruction to your task. Connection steps and accessible records depend on the client and its permissions; use the setup appropriate to that client.

Draft a PRD for [current product goal, audience, and scope]. Use relevant conversations from Hemory that you can access through this connection, plus the current materials I provide. Do not assume you can access every conversation or source.

Before drafting requirements, organize material items with these fields:
- Requirement or decision, in neutral language
- Status: discussed, proposed, agreed, or unresolved
- Source: conversation/session, date, speaker, or short supporting wording, only when identifiable from accessible material
- Conditions or scope limits
- Assumptions needed to interpret or complete the item
- Open question, if a decision or necessary detail is missing

Keep assumptions separate from what someone said. Do not turn a suggestion into an agreement, infer an owner or deadline, or treat a later mention as automatically replacing an earlier decision. Preserve accepted conditions. If sources conflict, show the conflict and leave the affected point unresolved rather than choosing silently.

Then draft the PRD using agreed items as requirements. Label proposed or assumption-dependent material clearly for review; list unresolved items as questions, not settled requirements. Do not invent source references or quotations. If you cannot identify a source for an item, say so. End with the decisions and current information I need to confirm.

This request asks the agent to retrieve accessible conversation context and draft from it, rather than requiring you to assemble a manual quote log first. The agent does the retrieval and drafting it can support; you provide the current goal and review the result. A source-reference request is a safeguard, not a guarantee that every client will return a reference for every item.

Review the draft before using it

Do not reread every transcript by default. Focus on items where an incorrect label, condition, or interpretation could change the work.

  1. Check the evidence behind consequential requirements. Does the cited material support the requirement’s actual wording, audience, and scope? If a reference is missing or unclear, locate another accessible record or ask a focused question.
  2. Test agreement, not just mention. A suggestion is not accepted just because it was discussed. Check that the relevant people or decision process accepted the item, and preserve any limits or prerequisites. Do not invent authority from someone’s job title or presence in the discussion.
  3. Keep facts and interpretation apart. Mark inferred thresholds, behaviors, or priorities as assumptions unless the evidence establishes them. Label acceptance criteria that translate broad language into precise behavior as draft interpretations when they have not been confirmed.
  4. Resolve conflicts carefully. Compare the wording, scope, and timing of the records. A later mention does not automatically replace an earlier agreement; identify what changed and what remains in force, or leave the conflict open.
  5. Confirm what only the team can decide. Check unresolved product behavior, priorities, owners, deadlines, and approvals against current information. A generated PRD is a draft for review, not approval to update another system or commit the team.

For example, a discussion may contain a proposal to let administrators export reports, while a later exchange confirms exports only for account owners. The draft should preserve the narrower accepted scope and flag any remaining question about administrators. It should not silently combine the proposal and later clarification into a broader agreement.

Turn the review into a usable PRD

The draft is ready for team review when each important requirement has a status, its wording matches the available evidence, and material conditions or assumptions are visible. Keep unresolved questions easy to find, and distinguish draft interpretations from confirmed behavior. If the agent cannot identify a source, resolve the point from an available record or keep it open; do not fill the gap with a confident-sounding sentence.

Use Hemory to preserve and retrieve relevant discussions when they are captured there, so you can participate without trying to write down every potentially useful detail. Then give a connected agent the current task and review its draft for evidence, status, and scope. The method still works with other accessible records; the essential safeguard is not to let polished prose turn uncertainty into agreement.

FAQ

Should every requirement have a source reference?

Ask for a reference for each material item when the agent can identify one. If it cannot, the draft should say the source is not identifiable from accessible material. Do not invent references, and do not treat a missing reference as proof that no discussion occurred.

Can an AI agent decide whether the team agreed?

It can classify the evidence it retrieves, but the label still needs review. Agreement depends on what was accepted, by whom through the relevant decision process, and within what scope. When the evidence does not establish that, keep the item unresolved or proposed.

What if the conversations disagree with the current brief?

Show the conflict and check which source is current and applicable. A later statement may clarify or change an earlier one, but chronology alone does not prove that it superseded the agreement. Confirm the intended current direction before treating it as settled.

Start building your memory palace

Download Hemory — from today on, every real conversation becomes material you can generate from tomorrow.

Get Hemory for iOS Get Hemory for Android Download APK

macOS, Windows, Linux, Web, and Self-host coming soon