On this page
Discovery notes often mix what a customer explicitly asked for with what the proposal writer thinks would make sense. If those are treated as the same thing, a suggestion can quietly become an apparent customer requirement.
Use a simple status-labeled checklist to classify each budget, timing, technical, and scope item before drafting. Keep the source beside each entry, and leave missing or ambiguous details open rather than filling them with guesses.
TL;DR
- Mark each item Stated, Unclear, or Not discussed based on the supplied call notes or transcript.
- Record the supporting wording or a precise source pointer; do not turn a preference or suggestion into an accepted constraint.
- Keep your recommendations separate from customer requirements, and ask follow-up questions only about gaps that affect the proposal.
- If the discovery call was captured in Hemory, its transcript-based Q&A can help locate relevant discussion. Review the source before relying on a detail.
Use three statuses to show what the customer actually said
Apply a status to each specific constraint—not to an entire topic such as “budget” or “technical.” The status describes the evidence in your notes, not how confident you feel about your interpretation.
| Status | Use it when | What to do next |
|---|---|---|
| Stated | The supplied material explicitly gives a constraint, limit, or condition. | Record it plainly and retain the supporting wording or source location. Preserve any conditions. |
| Unclear | The topic came up, but the limit, meaning, or implication is ambiguous. | Record what is unclear and ask a focused question if it affects the proposal. |
| Not discussed | The supplied material does not establish a constraint on this point. | Leave the value blank or mark it not discussed. Do not infer it from silence. |
A customer’s stated preference is not automatically a firm constraint. For example, “It would be helpful to launch before summer” expresses a preference, but does not establish a specific deadline. Record the statement and classify the timing as Unclear until the customer confirms what “before summer” means and whether it is a requirement.
Likewise, a missing budget amount does not mean the customer approved your estimate. If the customer explicitly says a budget has not been set, record that statement under Not discussed for the budget limit, along with the note that no amount is established.
Build a checklist that keeps evidence and interpretation separate
Use one row for each constraint or unresolved question. Add a source pointer—such as a note heading, timestamp, or transcript passage—when available. If you paraphrase, keep it faithful to the source; do not put paraphrases in quotation marks.
| Area | Constraint or question | Status | Supporting wording or source | Follow-up needed? |
|---|---|---|---|---|
| Budget | Stated / Unclear / Not discussed | |||
| Timing | Stated / Unclear / Not discussed | |||
| Technical needs | Stated / Unclear / Not discussed | |||
| Scope and exclusions | Stated / Unclear / Not discussed |
Add rows for other topics that materially shape the offer, such as access restrictions, dependencies, or who will review the work. Do not add a topic merely to make the checklist look complete.
Keep your own ideas in a separate section:
| Proposal recommendation | Why you recommend it | Customer approval needed? |
|---|---|---|
| Yes / No |
This separation lets you make useful recommendations without implying that the customer requested or approved them.
Example: classify the evidence before deciding what to include
Consider these discovery-call notes:
- “The booking page needs to work with our existing booking system.”
- “We hope to launch before summer.”
- “We haven’t set a budget yet.”
The checklist could look like this:
| Area | Constraint or question | Status | Supporting wording or source | Follow-up needed? |
|---|---|---|---|---|
| Budget | No budget amount is established. | Not discussed | Customer said a budget has not been set. | Yes—ask whether they have a planning range or process for setting one. |
| Timing | The customer hopes to launch before summer; the required date is not clear. | Unclear | “We hope to launch before summer.” | Yes—ask what date they have in mind and whether it is a firm deadline. |
| Technical needs | The page needs to work with the existing booking system. | Stated | “The booking page needs to work with our existing booking system.” | Yes—identify the system and any integration requirements before estimating. |
| Scope and exclusions | No additional scope or exclusions are established in these notes. | Not discussed | No supporting statement in the supplied notes. | Only if the proposal depends on defining them. |
The notes do not establish a budget, a fixed launch date, the name of the booking system, or approval of a particular technical approach. Those details should remain open. A writer might recommend a discovery step to clarify the integration, but should label it as a recommendation—not as a customer requirement.
Find the source, then decide whether a gap matters
Start with the record you actually have: call notes, a transcript, a CRM entry, or another document. If the customer discussion was captured in Hemory, its built-in Q&A supports multi-turn, transcript-based questions about captured Memory, including retrieval across conversations. You can ask it to help locate what the customer said about budget, timing, technical needs, or scope. Then review the relevant source material before classifying the constraint; a transcript is a record, not a guarantee that every word or speaker label is perfect.

Retrieve past commitments and draft follow-up tasks.
If the discussion was not captured in Hemory, use the notes or other accessible source instead. Hemory cannot retrieve an exchange that was never recorded there. When no usable record establishes a detail, mark it Not discussed or Unclear as appropriate and ask the customer a focused question. Do not reconstruct a missing answer from what seems typical for similar projects.
Not every gap needs to delay a proposal. Ask whether the missing detail changes the price, feasibility, scope, timing, or a material assumption. If it does, seek clarification or state the assumption explicitly as a proposal condition. If it does not, leave it open for a later stage rather than inventing an answer.
Check the list before drafting
Before turning the checklist into proposal language, make sure that:
- Every item labeled Stated has support in the supplied material.
- Ambiguous preferences and conditions have not been rewritten as firm requirements.
- Not discussed means the record does not establish the detail; it does not mean the customer agreed to your preferred answer.
- Recommendations, estimates, and proposed approaches are labeled as yours unless the customer accepted them.
- Follow-up questions address only gaps that could affect the offer or its assumptions.
Then draft the proposal using the supported constraints, and make any necessary assumptions visible for review. This lets you present a clear recommendation without attributing your judgment to the customer. When a captured discussion is available in Hemory, retrieving it can reduce the work of reconstructing and re-entering what was said; the checklist and your review keep the proposal’s claims grounded.