A project update can be hard to assemble when its decisions are spread across several meetings. A connected AI agent can retrieve relevant context from meetings captured in Hemory and draft an update, so you do not have to reconstruct every discussion first. You still need to supply what has happened since those meetings and review the draft before sharing it.
TL;DR
- Ask the agent to separate accepted decisions from proposals, conditions, and open questions.
- Request the source meeting and date for each decision when those details are present in the retrieved material. If the source is unclear or unavailable, have the draft say so rather than guess.
- Add current progress yourself. A past commitment or decision does not establish what has been completed now.
- Review any apparent changes or conflicts before treating one version as current.
1. Set the reporting scope and provide current information
Before drafting, give the agent the project and reporting period, who will read the update, and the format you need. Add current facts that may not appear in past meetings: progress since the last update, current risks, completed work, and any changes to owners or dates that your team has confirmed.
A captured conversation can provide historical context, but it cannot establish progress that happened afterward. Keep the reporting period clear so an old decision is not presented as a current status.
If the relevant discussions were captured in Hemory and your connected agent has supported access to them, ask the agent to retrieve context for the project. The available connection and retrieved material determine what it can use; do not assume it can access uncaptured discussions or every detail in your history.

Retrieve past commitments and draft follow-up tasks.
2. Ask for a draft that distinguishes decisions from discussion
A status update should not turn every suggestion into a commitment. Ask the agent to separate what the team accepted from ideas that were proposed, conditions that remain unmet, and questions that were left open. For each accepted decision, include its rationale when the retrieved context supports it.
You can adapt this request:
Draft a stakeholder status update for [project] covering [reporting period]. Use relevant captured meeting context available through this Hemory connection. Separate accepted decisions from proposals and open questions. For each decision, include its rationale and the source meeting and date when those details are available in the retrieved material. Mark missing source details as unavailable. Flag decisions that appear to have been revisited, changed, or left conditional; do not assume which version controls if the record is unclear. Do not infer current progress, approval, owners, dates, or completion from past discussions. Use these current updates: [add confirmed progress and changes]. Organize the draft into overall status, decisions, progress, risks or open questions, and next steps. End with the points I should confirm before sharing.
The agent performs its own retrieval and drafting through the supported connection. Hemory provides access to captured context; it does not determine which historical statement is the current decision. Treat source meeting names and dates as useful only when the retrieved material supplies them. If the draft cannot identify a source, keep that limitation visible rather than filling it in from memory.
3. Review changes and open points before sharing
Read the draft as a working document, not as a record of approved status. Pay particular attention to:
- Decision state: Was the item accepted, or only suggested? Preserve conditions and any unresolved part of an agreement.
- Changes over time: A later mention may revisit an earlier decision without replacing it. Check what was actually accepted and which parts, if any, changed.
- Source and attribution: Confirm that the cited meeting supports the decision and rationale. A speaker is not automatically the owner of the resulting work.
- Current progress: Compare historical commitments with current information. A past promise does not show whether work is now complete.
- Next steps: Include an owner or date only when it is established or you have confirmed it. Otherwise, list it as a point to resolve.
If a missing detail would change the update, check an available record or ask a focused question. Do not require a complete manual timeline before using the agent; review the gaps that matter to the reader’s understanding and next action.
4. Turn the reviewed draft into a useful update
Before sharing, make sure the update tells stakeholders what is true for the reporting period and what remains uncertain. A practical structure is:
| Section | What to include |
|---|---|
| Overall status | Current position, using information confirmed for this reporting period |
| Decisions | Accepted decisions, rationale, and source meeting details when available |
| Progress | Work completed or underway, based on current information rather than historical intent |
| Risks and open questions | Conditions, unresolved points, or apparent conflicts that need attention |
| Next steps | Confirmed actions and owners, plus any ownership or timing that still needs agreement |
Keep uncertainty specific. For example, if an earlier decision is clear but its current status is not, preserve the decision and mark only the progress as unconfirmed. If the record does not establish whether a proposal was accepted, label it as unresolved rather than calling it a decision.
FAQ
Does the connected agent automatically know what happened after the meetings?
No. It can use relevant captured context available through its supported Hemory connection. Add current progress and other new information that the update needs, then review the draft.
What if a decision has no source meeting in the draft?
Treat the source as unverified. Check an available record or ask a focused follow-up; do not invent a meeting, date, or speaker attribution. Whether the connection returns source meeting details depends on the retrieved material and the supported agent route.
Should the latest mention always replace an earlier decision?
No. A later mention may confirm, revise, or simply refer back to an earlier decision. Check whether a change was accepted and preserve any parts that were not changed.
Next step
Start with one project and a defined reporting period. If the relevant meetings were captured in Hemory and your agent can retrieve them through a supported connection, ask for a structured draft and add confirmed current progress. Review the decision states, source details, and unresolved points before sharing it.