On this page
A requirement in a near-final PRD can sound settled even when no one can explain where it came from. That makes review feel personal: questioning the requirement can seem like questioning its author. Instead, treat the missing source as a specific gap to investigate. You may find the supporting discussion, discover that the statement is an assumption, or learn that its rationale needs confirmation.
TL;DR
- “No source found” means the rationale is not currently traceable; it does not prove the requirement is wrong or that no evidence exists.
- Search the records that could support the requirement, then distinguish a located rationale from an assumption or an unresolved item.
- If the relevant discussion was captured in Hemory, its built-in Q&A can help retrieve context across conversations. It cannot recover a conversation that was never captured.
- Keep the PRD’s status honest: record what is known, what remains uncertain, and what must happen before the requirement is treated as confirmed.
First, define what “no source” means
A requirement may lack a source in the draft without being evidence-free. Its basis could be in an interview, customer feedback, a product discussion, research, an existing decision, or a constraint such as a policy or technical dependency. The reviewer may simply not have that record in front of them.
Conversely, a sentence that appears in meeting notes is not automatically an agreed requirement. A suggestion, a question, and an accepted decision carry different weight. Trace the reason for the requirement, not just a mention of similar words.
Start by isolating the exact claim. If a requirement bundles several claims, separate them: each may have a different rationale or status. For example, “Users can export reports as CSV so finance teams can reconcile monthly usage” contains both a capability and a reason. The source for one may not support the other.
Review each requirement with a short evidence record
Make a small list of the requirements that reviewers cannot currently trace. You do not need to reconstruct every conversation before starting. Capture enough information to investigate each item and keep uncertainty visible.
| Field | What to record |
|---|---|
| Requirement | The exact PRD statement, or the clause that needs support |
| Source status | Located, not yet located, or no supporting basis identified |
| Evidence or rationale | What the source actually says, if found; otherwise leave it open |
| Next step | Search a record, ask a focused question, or mark the requirement as an assumption |
A first pass might look like this:
| Requirement | Source status | Evidence or rationale | Next step |
|---|---|---|---|
| Users can export reports as CSV | Not yet located | No supporting discussion identified in the records reviewed | Ask the author what prompted the requirement; search relevant feedback and product discussions |
“Not yet located” is more accurate than “no evidence exists” after a limited search. Do not fill the evidence field with a guessed customer request, decision, owner, or deadline.
Search likely sources before changing the PRD
Use the source that fits the requirement. That might be an interview record, a feedback item, a decision log, a project document, or a discussion transcript. Search by the feature, user need, problem, or rationale—not only by the exact wording in the PRD. The original discussion may describe the need differently from the final requirement.
If you use Hemory, first make sure the relevant discussions were captured there and are accessible to you. Its built-in Q&A supports multi-turn questions grounded in transcripts and retrieval across different conversation sessions. You can ask about the requirement’s rationale or the discussions around the feature instead of manually assembling a complete chronology first. For example:

Retrieve past commitments and draft follow-up tasks.
What captured discussions mention CSV export or the reporting need behind it? Separate direct requests, proposals, and decisions, and tell me if you do not find a clear rationale.
Treat the answer as a lead for review, not proof that the requirement is supported. Confirm that you can identify the underlying record and that it supports the specific claim. The available product information does not establish that every Q&A result provides a source link or timestamp. If you cannot identify the supporting conversation, leave the item untraced and use another record or ask a focused follow-up. Hemory cannot retrieve an exchange that was never captured there.
Decide whether the requirement is supported, assumed, or unresolved
After searching, assign a status that describes what you actually know:
- Source located: The record supports the requirement or its stated rationale. Note the relevant source and any important qualification.
- Assumption: The requirement is a proposed product choice or interpretation, not something established by the evidence found. Label it as an assumption and identify who or what needs to confirm it through the team’s normal process.
- Unresolved: The record is missing, ambiguous, or insufficient to tell whether the requirement is supported. State the specific question that remains open.
A source may support only part of a requirement. Preserve that part and identify the gap precisely rather than treating the entire statement as either confirmed or baseless. Likewise, a discussion can contain a proposal without showing that the team accepted it. Do not turn a mention into agreement or an assumed owner into a commitment.
For the CSV example, suppose a search finds a discussion about monthly reporting but no mention of export format. The need for reporting may have support; the choice of CSV may still be an assumption. Split those points in the PRD or note that the format needs confirmation.
Choose a next step proportionate to the gap
If a relevant record is likely to exist, search another suitable source or ask the author what prompted the statement. A concise question is more useful than a general objection: “What user need or decision led us to specify CSV export?” If the author points to a discussion, review whether it supports the requirement as written.
If no source turns up, do not invent one to make the PRD look complete. Mark the requirement as an assumption or open question, and follow the team’s review process to decide whether it should be confirmed, revised, deferred, or removed. The PRD can move forward only with a clear understanding of that status; whether an unresolved item blocks progress depends on its impact and the team’s decision process.
A transcript can help locate what was said, but it is not a guarantee of perfect transcription or proof that a proposal was accepted. Compare the wording and status with the relevant discussion or current decision record when that distinction affects the work.

Find individual statements in a searchable transcript.
Keep the handoff clear
When the review ends, each flagged requirement should have a status and a next step—not a fabricated explanation. Share enough of the rationale in the PRD or review record for the next reader to understand what is supported and what still needs confirmation. If a requirement depends on an answer that has not arrived, keep it visibly open rather than implying approval.
Hemory can reduce the work of recalling and searching discussions that were captured there, while helping you stay engaged during future conversations instead of trying to write down every potentially useful detail. The review decision remains yours and your team’s. Start with the specific requirements you cannot trace, search the records most likely to explain them, and carry forward only the evidence and status you can actually establish.
FAQ
Does a requirement without a source have to be removed?
No. First find out whether its rationale is recorded elsewhere or whether it is an assumption that needs confirmation. The team can then decide what to do based on the requirement’s impact and its review process.
Does a mention in a meeting prove that the team agreed?
No. A proposal or discussion is not necessarily an accepted decision. Check what was actually agreed, by whom and within what scope; leave the status open if the record does not establish that.
Can Hemory find a discussion that was never recorded?
No. Hemory can help retrieve relevant context from conversations captured there, but an uncaptured exchange must be recovered from another source or clarified with someone who can confirm it.
Do I need to summarize every discussion before searching?
No. Begin with the requirement and useful clues such as the feature, user need, or rationale. If you use Hemory’s built-in Q&A, ask about the relevant captured discussions, then confirm that any result you rely on supports the exact requirement.