How to Label Conflicting Feedback in a PRD

Download Hemory
On this page

When customer conversations point in different directions, a PRD can make an open question look settled simply by placing one preference in the requirements section. Keep each position separate, label what has happened to it, and show the source and remaining question. The structure below helps engineering and design see what is known without implying approval.

TL;DR

  • Label each position as discussed, proposed, or agreed; use unresolved for a question or conflict that still lacks a decision.
  • Record the source and the evidence for the status. A suggestion is not an agreement, and a speaker is not automatically the decision-maker.
  • Keep the disagreement visible, name the specific open question, and do not add an owner or deadline unless the record establishes one.
  • If the conversations were captured in Hemory, its built-in Q&A can help you revisit transcript-based context. Review the relevant source before documenting attribution or status.

Start with the status, not the preferred outcome

Use the label that describes what the available evidence establishes—not what you think the team should do next.

StatusUse it whenDo not imply
DiscussedSomeone raised a concern, need, or option, but the record does not establish that they advocated a specific decision.That the team supports the point or will act on it.
ProposedA person or group recommended a specific option, but it has not been accepted as a decision.That the proposal is approved or committed.
AgreedThe relevant decision process shows that an option was accepted, within a clear scope.That every implementation detail is settled or that work is complete.
UnresolvedA question or conflict remains open, or the available evidence does not establish a decision.That nobody discussed it, or that an earlier agreement has been withdrawn.

A proposal can remain unresolved as a decision. Record both facts where useful: the option was proposed, and the choice between alternatives remains unresolved. If a team agreed on a guardrail but not the design, document the guardrail as agreed and the design question as unresolved. Do not let one status swallow the distinction.

Copy-ready structure

Add a row for each distinct position or decision—not one row for the whole disagreement. Replace the bracketed instructions with information supported by the record.

Item or positionSourceStatusEvidence and scopeOpen question
[State the feedback, proposal, or decision plainly.][Conversation, date or identifying detail, and speaker if known.][Discussed / Proposed / Agreed / Unresolved][What the source establishes; note whether this is a quote or paraphrase.][The specific question that remains, or “None stated in the reviewed record.”]

For a readable PRD, keep the status next to the statement it qualifies. Use a source reference that helps a teammate locate the underlying material. If the speaker is not reliably identified, say so rather than assigning the comment to a guessed person. Separate your interpretation from what the source actually says.

“None stated in the reviewed record” means you did not find an open question in the material you reviewed; it does not mean no question exists elsewhere. Likewise, a missing decision in one source is not proof that the team never decided.

Worked example: one guardrail, two proposed designs

Consider a product team reviewing feedback about where users should control data exports. The example assumes its source records show that customers suggested different locations, while a product review documented agreement on one access-control requirement. The design choice remains open.

Item or positionSourceStatusEvidence and scopeOpen question
Export access should follow existing project permissions.Product review record; the record documents acceptance of this guardrail.AgreedThe agreement covers access control, not where users change export settings.Where should the setting appear in the interface?
Put the export control on the project page.Customer conversation A; speaker attribution is available in the reviewed record.ProposedThe customer recommended this location. The source does not establish team acceptance.Should the project page be the chosen location?
Put the export control in account settings.Customer conversation B; speaker attribution is available in the reviewed record.ProposedThe customer recommended a different location. The source does not establish team acceptance.Should account settings be the chosen location?
Which location best supports the intended workflow?The two customer conversations and the product review record.UnresolvedThe records contain competing recommendations but no accepted choice between locations.What evidence or decision process will settle the placement?

The sources establish different customer recommendations, not a decision between them. The agreed guardrail can stand while the interface question remains open. This makes the current state useful to engineering and design without turning feedback into a requirement by implication.

If the records do not show who will decide or when, leave those fields out or mark them as unstated. Do not assign an owner because someone raised the issue, and do not add a deadline to make the table look complete.

Retrieve and check the source before assigning a label

Start with records already available to the team, such as a research repository, notes, a transcript archive, or Hemory. If the relevant conversations were previously captured in Hemory, its built-in Q&A Agent supports multi-turn, transcript-based questions about Memory and can retrieve across conversation sessions. For example, ask which options customers suggested for export settings and what, if anything, the product review accepted.

Agent session searching a past sync and drafting a follow-up checklist.

Retrieve past commitments and draft follow-up tasks.

Use the result to find the relevant source material, then check the wording, attribution, and scope before filling the table. Q&A can help you revisit captured context; it does not establish that every relevant conversation was captured or retrieved. If a key detail is missing, consult another available record or ask a focused follow-up. A person’s recollection may help explain their view, but it should not be presented as another speaker’s exact words.

Review the section before sharing it

Before circulating the PRD, ask:

  • Does every position have a source that a teammate can locate?
  • Does the status match what the source establishes, rather than what seems likely?
  • Are proposals clearly separated from accepted decisions?
  • Does an agreement have a clear scope, with unresolved details kept open?
  • Are attribution, owner, deadline, and approval stated only when supported?
  • Does the open question identify what still needs clarification or a decision?

Hemory can reduce the work of reconstructing what was said when relevant conversations were captured there. The PM still judges the evidence, resolves or preserves the open question, and reviews the PRD before circulation. Share the section as a record of the current state—not as an approved decision unless the appropriate process has established approval.

FAQ

Should customer feedback ever be labeled “agreed”?

Only when the relevant team decision process shows that the feedback was accepted as a decision. A customer’s preference can be discussed or proposed without being a team commitment.

What if the source is unclear or attribution is uncertain?

State the uncertainty in the source or evidence field and avoid attributing the position to a specific person unless the record supports it. If the missing attribution changes the decision, seek clarification rather than guessing.

Can I mark a decision unresolved when people have discussed it several times?

Yes. Repetition shows that a topic came up more than once; it does not establish agreement. Record the positions and sources, then state what remains undecided.

Does Hemory decide which feedback belongs in the PRD?

No. If relevant conversations were captured, Hemory’s transcript-based Q&A can help you revisit their context. The PM decides what is relevant, assigns defensible labels, and reviews the section before sharing it.

Start building your memory palace

Download Hemory — from today on, every real conversation becomes material you can generate from tomorrow.

Get Hemory for iOS Get Hemory for Android Download APK

macOS, Windows, Linux, Web, and Self-host coming soon