How to Give an Agent Past Conversations for a Weekly Update

Download Hemory
On this page

A weekly agent report can repeat last week’s points if each run starts with the same broad request. It can also mistake an item mentioned again for a new decision. To produce a change-focused update, give the agent last week’s report as a baseline, then have it retrieve relevant conversations captured for the current reporting period. Review how it classifies changes before sharing the result.

TL;DR

  • Give the agent both the previous report and this week’s date range. A recurring request alone does not provide a reliable comparison baseline.
  • Ask it to separate newly reported items, changes, carried-forward items, resolved items, and open questions. A first appearance in this week’s report does not prove the underlying decision was made this week.
  • Hemory can provide captured conversation context through supported agent connections. The external environment handles scheduling, and you review the draft before it is shared.

Set up a consistent comparison

A useful weekly update compares this period’s evidence with a known baseline. It should not assume that the agent remembers its previous run or that a new report will automatically include the last one.

Before the first run, prepare:

  1. A previous report. Use the last version your team actually reviewed or shared. If you do not have one, create a short starting baseline with the headings you want to use. Do not treat an unreviewed draft as an agreed record.
  2. A reporting window. State the start and end dates, along with the time zone if it matters to your team. Keep the cut-off consistent across runs.
  3. Access to relevant conversations. The discussions must already be captured in Hemory and accessible through the connected agent. If an important conversation was not captured, use another available source or add the missing information yourself.
  4. A recurring run in your agent environment. Scheduling belongs to the external agent or automation environment, not to Hemory. Set the recurrence there and check how that environment supplies the prior report and current date range to each run.

Connection steps and permissions vary by client. Follow the client’s setup instructions and confirm that it can retrieve the relevant Hemory Memory before relying on the workflow. A public listing of an agent does not establish that every client has the same tools, access, or behavior.

MCP settings panel with a masked key, agent labels, and a read-only note.

Review MCP connection options and access settings.

Give the agent both the baseline and the new context

For each run, provide the previous report and the current reporting window. Then direct the connected agent to retrieve relevant captured conversations from that period and compare them with the baseline. This gives it the information needed to distinguish a changed status from a repeated mention.

You do not need to prepare a full chronology or summarize every discussion first. Hemory supplies accessible captured context; the connected agent retrieves and drafts from what it can access. Add current information the agent cannot retrieve, such as an update from another system or a correction to the reporting scope.

Agent session searching a past sync and drafting a follow-up checklist.

Retrieve past commitments and draft follow-up tasks.

A request for the connected agent might be:

Prepare this week's update for [team or project].

Reporting period: [start date] through [end date], [time zone].
Use the attached previous report as the comparison baseline.
Retrieve relevant conversations captured in Hemory for this period using the connected Memory access.

Separate the result into:
- New or newly reported items
- Changes to items in the previous report
- Resolved items
- Open items with a new update
- Items carried forward with no update found in the captured conversations

For each item, summarize the evidence and identify the relevant conversation or date when available. Distinguish when something was discussed from when it was decided or completed. Do not invent owners, deadlines, approvals, or status changes. Flag uncertainty and missing information rather than filling gaps.

The period and baseline are deliberate inputs. The request also asks the agent to avoid treating a mention as a decision or an earlier commitment as proof of current progress.

Classify changes without overstating them

Use labels that describe what the evidence supports. In particular, “newly reported” is not always the same as “newly decided”: an item may appear in this week’s retrieved conversations even though the underlying decision predates the reporting window.

LabelUse it whenAvoid implying
New or newly reportedThe item is absent from the baseline and appears in relevant current-period material.That it necessarily began or was decided during this period.
ChangedCurrent-period evidence shows an update to an item in the baseline.That a later mention automatically replaced an earlier agreement.
ResolvedEvidence supports that the open item was completed or otherwise resolved.That preparation, sending, or discussion alone means approval or completion.
Open with an updateThe item remains unresolved, and current evidence adds a condition, decision, or next step.That a proposed owner or date was accepted.
Carried forwardThe previous report listed the item, and the current-period retrieval found no update.That the item is confirmed to remain open now.

For example, if last week’s report listed a review as waiting on revised figures and this week’s conversation says they are ready but does not show they were shared, the update should not call the review complete. It can state that the figures are ready and that sharing them remains a next step, if the source supports that action.

When a carried-forward item has no new evidence, preserve its prior status and mark that no update was found in the captured material. Silence in the retrieved conversations does not prove that work stopped, was completed, or was never discussed elsewhere.

Review the draft before sharing

Check the report for the distinctions that could change what someone does next:

  • Coverage: Does the date range match the requested period? Were relevant conversations captured and accessible? Are important sources outside Hemory still needed?
  • Change claims: Does each “new,” “changed,” or “resolved” label follow from the comparison and the available evidence?
  • Commitments and status: Are proposals, accepted decisions, owners, deadlines, delivery, and approval kept distinct? A missing deadline does not cancel an established commitment, and a proposed owner is not automatically accountable.
  • Current state: Does the report distinguish an old status from a verified current update? Has a repeated mention been mistaken for a separate event or accomplishment?
  • Uncertainty: Are gaps marked for follow-up rather than filled with plausible-sounding details?

You do not need to replay every conversation or demand a quotation for every statement. Review the supporting material for claims that change a commitment, decision, owner, deadline, or next action. Correct the draft and add any current information that was not captured or accessible.

The connected agent drafts the report; it does not establish that the team approved it or share it into an external system on Hemory’s behalf. Use your existing review and sharing process.

Use a repeatable report structure

Keep the report short enough to scan while retaining the distinctions needed to act. A structure like this gives each run a consistent shape:

Weekly update: [team or project]
Reporting period: [start date]–[end date]
Compared with: [date or version of previous report]

New or newly reported
- [Item, evidence, and whether the underlying event date is known]

Changed
- [Item, prior state, supported current state, and evidence]

Resolved
- [Item and evidence of resolution]

Open with an update
- [Item, new condition or next step, and any confirmed owner or date]

Carried forward; no update found
- [Item and its prior reported state]

Needs clarification
- [Question or missing information that affects the report]

Remove empty sections if they add clutter, but keep the reporting period and comparison baseline clear. If the team prefers a different format, retain the same distinctions rather than relying on headings alone to imply status.

FAQ

Does the agent remember last week’s report automatically?

Do not rely on that. Supply the previous report as the baseline for each run unless your specific agent environment has a documented, dependable way to provide it.

Can the agent report on a conversation that was never captured in Hemory?

No. Hemory retrieval depends on relevant conversations having been captured and being accessible through the connection. Use another source or provide the missing detail when it matters.

Does Hemory schedule the weekly run or share the report?

No scheduling or external sharing should be assumed. The agent or automation environment handles recurring runs, and you review and share the resulting report through your team’s process.

Start with one reviewed baseline

Choose a previous report your team recognizes, define a fixed reporting window, and run the comparison against conversations captured for that period. Review the first draft closely for status changes and unsupported assumptions, then reuse the same baseline-and-period structure each week. Hemory provides relevant captured context to a supported connected agent, reducing the need to reconstruct and re-enter conversation details before every update.

Start building your memory palace

Download Hemory — from today on, every real conversation becomes material you can generate from tomorrow.

Get Hemory for iOS Get Hemory for Android Download APK

macOS, Windows, Linux, Web, and Self-host coming soon