On this page
When a project has unfolded across several conversations, a short prompt may leave an AI agent without the decisions, constraints, or open questions behind today’s task. Reconstructing that history yourself takes time and can leave out details you did not think to mention. If the relevant discussions were captured in Hemory and are accessible through your connected agent, you can ask the agent to retrieve context before it drafts. Use a two-stage process: inspect what it found, then request the document.
TL;DR
- Start with the document’s purpose, audience, and current status—not a full retelling of the project.
- Ask the connected agent to retrieve relevant Hemory conversations and identify the records it used. Treat this as a request, not a guaranteed feature of every agent.
- Review the retrieved context before drafting. Correct gaps, resolve current details, and distinguish established decisions from proposals or open questions.
- Then ask the agent to draft from the reviewed context and the new information you provide. You remain responsible for the final document.
1. Give the agent today’s task
State what you need, who will read it, and what the document should help them do. Include current information that earlier discussions cannot supply, such as a new status, a changed plan, or the date of an upcoming review.
Keep the request focused. The agent can use the task to look for relevant background; you do not need to summarize every past conversation first. Other sources—such as a current project brief or CRM record—may already contain what you need. Use Hemory when the conversations you want to draw on were previously captured there and are accessible through your connected agent. It cannot recover an exchange that was never recorded.
For example, you might say that you need a status update for a project sponsor, explain the update’s purpose, and provide the current milestone and reporting date. That gives the agent a search direction without presuming what earlier discussions decided.
2. Ask for retrieval and a reviewable record list
In a supported connection, Hemory provides access to Memory that an external agent can use for its own retrieval and drafting. The exact tools, accessible records, and ability to identify sources may vary by agent and connection. Ask the agent to show what it used before it writes the document. Do not assume that the request guarantees a complete search or a source list.

Retrieve past commitments and draft follow-up tasks.
You can adapt this prompt:
I need a [document type] for [audience] so they can [purpose].
The current situation is [current facts, date, and any new instructions].
Before drafting, search the Hemory Memory available to you for conversations relevant to [project or work item]. Focus on discussions that may establish the background, decisions, constraints, changes, or unresolved questions needed for this document.
First, return a retrieval summary only. List the conversations or records you relied on, using dates, titles, or other identifiers when available. For each, say briefly what it supports. Separate recorded information from inference, and flag conflicting, unclear, or missing details. Do not invent decisions, owners, deadlines, approvals, or current progress. If you cannot identify the records you used, or cannot access relevant Memory, say so and stop rather than presenting the summary as complete.
The request to identify records makes the result easier to inspect, but the agent may not be able to provide that detail. If it cannot show what it relied on, use its summary only as a lead. Check important points against accessible records or another current source before using them.
3. Review the context before asking for a draft
Check whether the retrieved material actually belongs to the same project and work item. Shared names or keywords alone do not prove that two conversations have the same scope. Then review details that could change what the document says or what someone does next:
- Decision and status: Was a choice accepted, merely proposed, or left open? Does the record establish current progress, or only an earlier commitment?
- Conditions and changes: Did an agreement depend on a condition? Did a later discussion change it, or add a separate requirement?
- People and ownership: Was someone assigned a task, or only mentioned as a participant? Do not treat a suggested owner as an accepted commitment.
- Current information: Which facts have changed since the captured discussion? Supply the latest information yourself rather than asking the agent to infer it.
- Evidence and uncertainty: Are records missing, unclear, or in conflict? Resolve material gaps or label them in the document.
For example, a past conversation may show that a team planned to review revised figures. That does not establish that the figures were later shared or reviewed. Keep those states separate and supply any current update you can confirm.
If a detail would affect the conclusion or next action and you cannot resolve it, ask a focused question or mark it as open. Do not turn uncertainty into a confident statement just to make the draft sound complete.
4. Ask for the draft from reviewed context
Once you have reviewed the retrieval summary and supplied corrections or new facts, ask for the document. Tell the agent which details to include, what remains uncertain, and what form the output should take. You do not need to re-enter the entire discussion history if the agent can still access the relevant Memory; give it the corrections and context that matter for the current task.
Draft the [document type] for [audience] using the retrieval summary I reviewed, the accessible conversations it identifies, and these current updates: [new facts or corrections].
Make clear what is an established decision, what is still proposed or unresolved, and what has changed since the earlier discussions. Do not fill gaps by guessing. Use [desired structure or length]. If a missing detail would change the recommendation or next action, flag it instead of inventing an answer.
The agent performs its own retrieval, reasoning, and drafting within the access its connection provides. Review the finished document for accurate attribution, current status, scope, and unsupported conclusions. Hemory provides captured Memory and context access; it does not approve the document or carry out arbitrary actions in another work system.
If the agent cannot retrieve or identify its sources
First, check whether the relevant conversations were captured in Hemory and whether this particular agent connection can access them. A general connection listing does not guarantee identical tools or scope in every client. If the agent cannot retrieve the material or explain what it used, do not treat that as proof the conversations do not exist. Use a source you can access—such as a current brief or project record—or provide the relevant text yourself. If no reliable record exists for a consequential detail, ask someone who can confirm it.
FAQ
Should I ask the agent to draft in the same prompt as the retrieval request?
For a document that depends on past project decisions, separate retrieval from drafting so you can review context first. For a simple lookup, a separate drafting step may be unnecessary.
Do I need to summarize every earlier conversation first?
No. Start with your current goal and ask the connected agent to retrieve relevant captured context. Add current facts and correct gaps after reviewing what it returns. If the agent cannot access the records, supply material from a source you can use.
Can I assume the agent’s list includes every conversation it used?
No. Ask for the records it relied on, but do not assume every client can produce a complete source list. When source identification is unavailable or unclear, check consequential details against accessible records before relying on them.
What if I am unsure whether a past conversation established a decision?
Keep the status open until you can assess the evidence, scope, and acceptance. A suggestion or later mention does not by itself establish an approved decision or show that a commitment was completed.
Use a reviewable first pass
For your next status update, proposal, or follow-up, give the connected agent the current goal and ask for a retrieval summary before requesting prose. That lets you focus on whether the project context is relevant and current instead of manually rebuilding the whole history. If the agent cannot identify the records it used, switch to sources you can inspect before relying on the draft.