# What Should a Decision Log Contain?

> Make a decision log understandable and checkable after a project ends. Learn which fields preserve the decision, authority, owner, conditions, status, and supporting source.

- URL: https://www.hemory.com/blog/workflows/what-to-include-in-a-decision-log/
- Language: English (en)
- Author: Hemory Team
- Published: 2026-11-28
- Last updated: 2026-11-28
- Summary: A durable decision log records the decision in clear language, when and by whom it was made, its scope and rationale, the people responsible for commitments, conditions, status, and a usable source reference. Keep proposals separate from accepted decisions and track changes without erasing what came before. Hemory can help retrieve context from conversations already captured, but the team still maintains and approves the log.
- Tags: decision logs, project documentation, decision-making

A decision log can outlive the project and still fail its purpose if a future reader cannot tell who agreed to what, why it was chosen, or whether it remains in force. A durable entry needs the decision itself, its authority and rationale, any resulting commitments or conditions, its current status, and a useful reference to supporting evidence.

## TL;DR

- State the decision plainly, with its date, scope, and status.
- Distinguish accepted decisions from proposals, unresolved questions, and actions. Record an owner or deadline only when it was actually assigned or agreed.
- Preserve the rationale, conditions, and source details a future reader needs to check the entry.
- Use Hemory to retrieve context from discussions already captured there; review consequential details and maintain the decision log in the team’s chosen record.

## What makes a decision log useful over time?

A durable [decision log](/blog/searchable-memory/decision-log-template/) helps a reader answer three questions: **What was decided? What supports that account? What is true now?** A bare list of outcomes may answer the first while leaving the other two unclear.

Treat each entry as a concise record, not a transcript. Include enough context to explain the decision and point to relevant evidence. Keep proposals, accepted decisions, commitments, and [follow-up actions](/blog/workflows/what-is-an-action-item/) distinct. When something changes, update its current status while preserving what changed and when; otherwise, a later reader may mistake an old decision for the current one.

## Core fields to include

The right structure depends on how consequential and long-lived the decisions are. A small project may need only a few fields. For decisions that affect scope, responsibility, or later work, include the details below or clearly mark them as unstated.

| Field | What to record | Why it matters |
|---|---|---|
| Decision | A concise statement of the accepted choice, including relevant scope. | Readers should not have to infer the outcome from discussion notes. |
| Date and status | When the decision was made, when it takes effect if different, and whether it is proposed, accepted, superseded, or otherwise current. | Separates a current decision from an older option or an unresolved discussion. |
| Authority and participants | Who made or approved the decision, and who contributed when that context matters. | A name mentioned in a conversation is not necessarily a decision-maker or owner. |
| Rationale and trade-offs | The reasons for the choice, important alternatives considered, and material risks or constraints. | Helps later readers understand the decision without reopening the entire discussion. |
| Scope and conditions | What the decision covers, what it excludes, and any condition that affects whether it applies. | Prevents a limited or conditional choice from being read as universal. |
| Commitments and owners | Agreed follow-up actions, the person who accepted each one, and any stated deadline. | Makes the work resulting from a decision traceable without turning an unassigned task into someone’s commitment. |
| Source reference | A usable reference to the meeting, document, or other evidence, with enough identifying detail to find it. | Lets a reader check consequential wording and context. |
| Change record | What changed, when, and what remains in force. | Preserves the decision’s history while making its current state clear. |

Not every field needs a value. If no deadline was stated, record “No deadline stated” rather than leaving readers to guess whether it was missed. If nobody accepted ownership, mark the owner as unassigned or needing confirmation. An explicit unknown is more useful than a confident-looking invention.

## Keep decisions, commitments, and actions separate

These are related but different records:

- A **proposal** is an option under consideration, not an accepted decision.
- A **decision** records the choice and the authority or process behind it.
- A **commitment** records a person’s accepted undertaking, including any condition.
- An **action** is work that follows from the decision. Its owner and deadline should reflect what was actually assigned or agreed.

A decision can be accepted even if its follow-up owner or deadline remains open. Record the accepted choice, then identify the specific missing assignment. Likewise, a person’s willingness to help is not automatically an accepted commitment. Preserve conditional terms rather than turning them into unconditional promises.

## Make the source reference checkable

A reference should help someone locate and interpret the supporting material. Record the source’s title or description, date, and location, plus a relevant passage or section when that helps. Use a link only if the intended readers can access it; a reference alone does not grant access. If a source may become unavailable, keep the essential rationale and conditions in the log itself, subject to your team’s record-keeping rules.

Do not treat any single format as automatically authoritative. A transcript can help check what was said, but it may not capture every detail perfectly. A current document may show an approved change; an older conversation may explain why the original decision was made. Compare the source’s content, scope, date, and approval to the question at hand.

## Use captured conversations to recover context

If a decision was discussed in a conversation already captured in Hemory, its built-in Q&A can help retrieve transcript-based context across conversations and support follow-up questions. For example, ask which discussion covered a particular scope choice and what [rationale or condition](/blog/searchable-memory/find-decision-rationale/) was mentioned. Hemory’s [Features page](https://www.hemory.com/features/) describes this transcript-based Q&A capability.

Use retrieved context as supporting material for the entry, not as the decision log itself. Review wording, attribution, conditions, and current status before recording them as fact. If a conversation was never captured or a necessary detail is not available, consult another usable source or ask a focused clarification. The team remains responsible for approving and maintaining the log.

## Example of a concise entry

Suppose a project team’s review record shows that it accepted a decision to include CSV export in the initial release. The discussion records that this scope supports an identified customer workflow; the team assigned implementation to Maya, but did not set a deadline. A concise log entry could read:

> **Decision:** Include CSV export in the initial release.
> **Status:** Accepted; current.
> **Rationale:** Supports the customer workflow discussed in the review.
> **Commitment:** Maya accepted implementation ownership. No deadline was stated.
> **Source:** Product review discussion, [date and accessible record reference].
> **Change history:** None recorded.

The example records the stated decision and assignment without turning the missing deadline into a missed one. In a real log, replace the source placeholder with a reference readers can locate, and use only the rationale and ownership supported by the record.

## A quick durability check

Before closing an entry, ask:

1. Can someone who was not present understand the decision and its scope?
2. Is it clear who had authority to make or approve it?
3. Are the reasons, conditions, and alternatives that matter later recorded?
4. Are owners, commitments, and deadlines supported by what people accepted?
5. Can a reader find the source and distinguish the original decision from later changes?

If an answer is no, add the missing information or mark it as unresolved. A useful decision log does not claim more certainty than its evidence supports; it makes both the decision and its limits clear.

## FAQ

### Does every decision-log entry need a source link?

Not necessarily, but consequential decisions should have a usable source reference or enough context to explain their basis. Make sure intended readers can access the referenced material.

### Should a decision log include action items?

Include follow-up actions when they result from the decision, but keep them distinct from the decision itself. Record an owner or deadline only when assigned or agreed, and track current progress in the appropriate working system.

### Is a meeting transcript enough to serve as a decision log?

Usually not by itself. A transcript can help check what was said, while a decision log states the accepted choice, its scope, authority, rationale, commitments, and current status in a form that is easy to scan.

## Keep the record useful to the next reader

A decision log lasts when it preserves the choice, the reasoning and authority behind it, the commitments and conditions it created, and a path to supporting evidence. Start with those fields, mark gaps honestly, and update changes without obscuring the history. When relevant discussion has already been captured in Hemory, retrieval can reduce the work of reconstructing context; the team still decides what belongs in the log and keeps the record current.

## Other language versions

- Japanese (ja): https://www.hemory.com/ja/blog/workflows/what-to-include-in-a-decision-log/
- Korean (ko): https://www.hemory.com/ko/blog/workflows/what-to-include-in-a-decision-log/