# How to Keep Open Questions and Assumptions Clear in a PRD

> Separate agreed requirements, proposals, assumptions, and open questions in a PRD. Use clear labels, evidence, and next steps so unresolved items do not read as decisions.

- URL: https://www.hemory.com/blog/workflows/prd-open-questions-assumptions/
- Language: English (en)
- Author: Hemory Team
- Published: 2026-11-27
- Last updated: 2026-11-27
- Summary: Keep a PRD honest by labeling each item as an agreed requirement, proposal, assumption, or open question. Record the evidence and impact of unresolved items, then assign next steps only when they are actually agreed. If relevant discussions were captured in Hemory, its transcript-based Q&A can help retrieve context; the team still decides what the record supports.
- Tags: PRD, product requirements, product management

A PRD can sound more certain than the discussions behind it. A suggestion may become a requirement in the draft, or an assumption may disappear into confident wording. Label each item by what the team actually established, and keep its evidence and unresolved parts visible. That gives reviewers a clear way to distinguish decisions from work that still needs discussion or validation.

## TL;DR

- Use separate labels for **Agreed requirement**, **Proposed**, **Assumption**, and **Open question**. A polished sentence is not evidence of agreement.
- Record the source or rationale, the impact if an item remains unresolved, and the next step. Leave an owner or date unstated unless it was assigned.
- If relevant discussions were captured in Hemory, its transcript-based Q&A can help retrieve context across sessions. Review what the record supports; it does not decide whether a requirement was approved.

## Label each item by its current state

Use a small, explicit set of statuses. Keep the status separate from priority: “high priority” does not mean “agreed.”

| Label | Use it when | Example wording |
|---|---|---|
| **Agreed requirement** | The relevant decision or requirement was accepted by the people with authority to make it. | “An admin can invite a teammate by email.” |
| **Proposed** | Someone suggested an option, but the team has not accepted it. | “Consider allowing invitations through a shareable link.” |
| **Assumption** | The draft depends on a belief that has not been validated. | “We expect most workspaces to invite one person at a time.” |
| **Open question** | A decision or fact needed to shape the requirement is not yet known. | “Can an admin revoke a pending invitation?” |

These labels describe different kinds of uncertainty. A proposal is a suggested choice; an assumption is something the draft is temporarily treating as true; an open question names what still needs an answer. Do not turn an assumption into an agreed requirement just because the rest of the document depends on it.

An item can contain both settled and unsettled parts. Keep the established part intact and mark only the unresolved condition. For example: “An admin can invite a teammate by email. **Open question:** Can the admin revoke an invitation before it is accepted?”

## Put the evidence and next step beside the item

A status label helps readers scan, but it does not explain why an item has that status or what would resolve it. Add enough information for a reviewer to assess the distinction without reconstructing the whole discussion.

A compact PRD entry can include:

| Field | What to record |
|---|---|
| **Item** | The requirement, proposal, assumption, or question in plain language. |
| **Status** | One of the four labels above. Use a proposed priority if priority itself has not been agreed. |
| **Basis** | A brief rationale or reference to the relevant discussion or current source. Distinguish a direct agreement from a paraphrase or inference. |
| **Impact if unresolved** | What part of scope, design, or evaluation depends on the answer. Use “Not yet assessed” if the impact is unknown. |
| **Next step** | The decision, evidence, or clarification needed. Add an owner or date only when someone has accepted that responsibility or deadline. |

For an open question, phrase the next step as a question to resolve, not as an invented answer. For an assumption, state what evidence would validate or change it. If the answer could alter scope, mark the item as a dependency or blocker only when that consequence is actually established.

## Example: keep a proposal from becoming a requirement

Suppose a product discussion established that workspace admins need to invite teammates by email. A shareable invitation link was suggested, but no one accepted it as part of the requirement. The team has not validated whether most workspaces invite one person at a time.

| Item | Status | Basis and next step |
|---|---|---|
| An admin can invite a teammate by email. | **Agreed requirement** | The discussion established this capability. Preserve any conditions that were part of the agreement. |
| Allow invitations through a shareable link. | **Proposed** | Suggested in discussion; acceptance is not established. Decide whether to include it in scope. |
| Most workspaces invite one person at a time. | **Assumption** | Not validated. Check relevant evidence before using it to shape the flow. |
| Can an admin revoke an invitation before it is accepted? | **Open question** | The answer may affect the invitation lifecycle. Resolve it before treating revocation as a requirement. |

The example does not assign a decision-maker or deadline because none was established. If the team later accepts the shareable-link proposal, [update its status](/blog/searchable-memory/track-requirement-changes/) and record the decision basis. Do not let that change silently replace the separate email-invitation requirement.

## Retrieve discussion context without treating it as approval

When a PRD draws on past conversations, first identify where the relevant discussion was recorded. It may be in notes, a transcript archive, a CRM, or another source. If the conversation was captured in Hemory, its built-in Q&A supports multi-turn, transcript-based questions about your Memory and can retrieve across sessions. A focused question about what was said regarding a particular requirement can help bring back context without manually rebuilding a full chronology.

![Agent session searching a past sync and drafting a follow-up checklist.](/blog-assets/article-images/hemory-memory-qa-agent.webp)

*Retrieve past commitments and draft follow-up tasks.*

Use the retrieved material to clarify wording, conditions, and [whether a point was proposed or accepted](/blog/searchable-memory/decisions-commitments-and-ideas/). The record is context for your judgment, not automatic proof that a decision was final or that every relevant discussion was captured. If the necessary detail has no usable record, consult another source or ask a focused clarification. Then update the PRD’s status and basis; do not present a guess as agreement.

## Review the draft before sharing it

Before circulating a PRD, scan for language that implies certainty: “will,” “must,” “the system supports,” or a requirement written without a status. For each consequential item, ask:

1. Does the available evidence show acceptance, or only a suggestion or discussion?
2. Is this an assumption the design depends on, or a question that still needs an answer?
3. Are any conditions, scope limits, or unresolved details missing from the entry?
4. Does the next step reflect what is actually needed, without inventing an owner, deadline, approval, or result?

Keep the labels until the relevant decision or validation changes the item’s state. A revised PRD is still a draft unless the appropriate review process approves it. Share the document through the team’s usual workflow and make sure reviewers can access any supporting material they need.

## FAQ

### Should every unresolved detail be an open question?

No. Use **Proposed** for an unaccepted suggestion and **Assumption** for an unvalidated belief the draft relies on. Reserve **Open question** for something that still needs an answer or decision.

### Can an assumption appear in a requirement?

It can inform a draft, but label it clearly and state what needs validation. Do not write the assumption as a settled requirement unless the team has established it.

### Does a transcript prove that a requirement was approved?

No. A transcript can help show what was said, but the wording, context, authority, and decision process still matter. Distinguish discussion from acceptance and preserve uncertainty where the record does not settle the point.

### Do I need to summarize every discussion before using Hemory?

No. If the relevant discussion was captured and is accessible through Hemory’s built-in Q&A, ask a focused question to retrieve context. Review the result and add current information the discussion cannot provide; do not assume the retrieved material is complete or approved.

## Keep uncertainty visible until it is resolved

A PRD is more useful when readers can tell what is settled, what is being considered, and what still needs evidence or a decision. Keep a short status and basis beside each consequential item, and update them when the team establishes new information. Captured discussions in Hemory can help recover relevant context, reducing the need to rely on memory or manually retell earlier conversations; the team remains responsible for deciding what that context supports.

## Other language versions

- Japanese (ja): https://www.hemory.com/ja/blog/workflows/prd-open-questions-assumptions/
- Korean (ko): https://www.hemory.com/ko/blog/workflows/prd-open-questions-assumptions/
