# PRD Open Questions and Assumptions: A Practical Section Template

> Use a copy-ready PRD section to separate agreed requirements, proposals, assumptions, and open questions, with evidence fields and a practical way to retrieve discussion context from Hemory.

- URL: https://www.hemory.com/blog/workflows/prd-open-questions-assumptions-template/
- Language: English (en)
- Author: Hemory Team
- Published: 2026-11-27
- Last updated: 2026-11-27
- Summary: Keep a PRD from turning uncertainty into false commitments. This guide provides a reusable section for agreed requirements, proposals, assumptions, and open questions; explains what evidence and follow-up each needs; and shows a worked example. For discussions captured in Hemory, built-in transcript-based Q&A can help retrieve prior context, while the team remains responsible for judging status and approving the draft.
- Tags: PRD, Product Requirements, Open Questions, Assumptions

A PRD can sound more certain than the discussions behind it. A suggestion may become a requirement in a polished draft, while an assumption or unanswered question disappears into a paragraph. Later, readers may treat those statements as settled. A short, consistently labeled section helps the team see what is agreed, what still needs a decision, and what must be validated.

## TL;DR

- Use four labels: **Agreed requirement**, **Proposal**, **Assumption**, and **Open question**. Choose the label that reflects what the available evidence supports.
- For each item, record its basis and the decision or validation still needed. Add an owner or date only when one has actually been assigned.
- If relevant discussions were captured in Hemory, its built-in transcript-based Q&A can help retrieve context. People still need to judge what the discussion established and approve the PRD.

## A copy-ready PRD section

Use one entry per distinct item. Keep the label visible in the heading or first field so that a reader does not have to infer status from polished prose.

| Field | What to record |
|---|---|
| **ID and label** | A reference such as `R-01 — Agreed requirement` or `Q-01 — Open question`. Use one primary label for each entry. |
| **Statement** | State the requirement, proposal, assumption, or question plainly. Do not make an uncertain item sound settled. |
| **Basis** | Note the relevant discussion, document, or other evidence. Describe what it supports, not what you wish it established. |
| **Impact** | Explain what part of the product, scope, or plan could change depending on the answer. |
| **Next step** | Say what would resolve or validate the item, if known. Record an owner or date only if the source or current instructions assign one. |
| **Last reviewed** | Add a date when the team needs to know when the entry was checked against the current plan. Do not confuse this with the date of the source discussion. |

Copy and adapt this structure:

```text
## Open Questions and Assumptions

### [ID] — [Agreed requirement / Proposal / Assumption / Open question]
- Statement:
- Basis:
- Impact:
- Next step:
- Owner or date: [only if assigned; otherwise leave unstated]
- Last reviewed: [date, if useful]
```

You do not need to fill every field with a guess. If the basis, impact, or next step is unknown, say so or leave it for clarification. An explicit blank or unresolved value is more useful than an invented answer.

## Choose the label by what the evidence supports

**Agreed requirement** means the relevant decision process established the requirement for the stated scope. Keep any conditions and boundaries attached to it. A firm statement in a draft, a person’s participation in a discussion, or a repeated suggestion [does not by itself establish agreement](/blog/searchable-memory/decisions-commitments-and-ideas/).

**Proposal** means someone suggested an option, but the available record does not establish that it was accepted. Preserve who or what raised it only when that matters to the decision; do not assign it an owner just because someone mentioned it.

**Assumption** means the plan is relying on something that has not yet been validated. State the assumption and why it matters, then identify what evidence would test it. An assumption is not a decision simply because the draft depends on it.

**Open question** means a specific answer or decision is still needed. Phrase it so readers can tell what would be resolved. If part of the matter is settled, keep that established part visible and ask only about the unresolved part.

These labels describe different kinds of information. A proposal is not an assumption: it is an option someone raised, while an assumption is something the plan is treating as true without validation. An open question may be how to decide between proposals or test an assumption. Give each entry one main label, and link related entries by ID if they depend on one another.

## Example: preserve the difference between a decision and a suggestion

Suppose a product discussion explicitly established that the first release should support CSV export. In the same discussion, PDF export was suggested but not decided. The plan also relies on an unvalidated assumption about how administrators will configure access, and the team has not answered whether scheduled exports belong in the first release.

| ID and label | Statement | Basis | Next step |
|---|---|---|---|
| R-01 — **Agreed requirement** | The first release supports CSV export. | The discussion explicitly established CSV export for the first release. | Carry the requirement into the relevant PRD section. |
| P-01 — **Proposal** | Add PDF export. | PDF was suggested; the discussion did not establish acceptance. | Keep it out of agreed scope unless the team decides to include it. |
| A-01 — **Assumption** | Administrators will configure access. | The plan relies on this, but it has not been validated. | Identify evidence or a review that could validate the assumption. |
| Q-01 — **Open question** | Does scheduled export belong in the first release? | No decision is recorded in this example. | Get the needed decision before presenting the scope as settled. |

The table does not assign owners, deadlines, or approvals that the discussion did not establish. If the team later decides to include PDF export, update its label and basis to reflect that decision; do not silently treat the earlier suggestion as though it had already been accepted.

## Retrieve discussion context without turning it into a verdict

If the relevant conversation was captured in Hemory, its [built-in Q&A](/features/) can help retrieve transcript-based context across conversations. For example, ask what was discussed about export formats and which points were explicitly decided, proposed, or left unanswered. Use the retrieved context to check the basis field and refine the entries. If a necessary discussion was not captured or the record does not resolve the point, consult another available source or ask a focused follow-up question.

Retrieval is not a status-labeling or PRD-approval step. A transcript can help show what was said, but it is not guaranteed to be complete or error-free; people must interpret the decision, scope, and current state. Hemory can reduce the work of searching and retelling captured discussions, but it does not generate or guarantee a complete PRD.

## Keep the section current

Review an entry when new evidence or a decision changes its status. Preserve the original scope and conditions where they still apply, and [record what changed](/blog/searchable-memory/track-requirement-changes/) rather than letting a later mention silently rewrite the history. Keep action-critical unresolved points in the PRD itself, not only behind a reference to a source that some readers may not be able to access.

Before circulating the draft, check that each item’s label matches its basis, unresolved conditions remain visible, and any stated owner or date is actually assigned. The PRD remains a draft until the appropriate people review and approve it.

## FAQ

### Should an assumption appear as a requirement in the PRD?

No. Keep it labeled as an assumption until it is validated or the team makes a decision that establishes a requirement. If the requirement depends on the assumption, show that dependency rather than presenting the assumption as settled.

### What if the discussion does not show whether a proposal was accepted?

Keep it labeled as a proposal or mark its status unresolved, then ask the relevant decision-maker for clarification. Do not infer acceptance from repetition, a participant’s presence, or polished wording in a draft.

### Do I need to assign an owner and deadline to every open item?

No. Include them when they have been assigned or when the team assigns them now. Otherwise, leave them unstated and make the decision or validation needed clear.

## Other language versions

- Japanese (ja): https://www.hemory.com/ja/blog/workflows/prd-open-questions-assumptions-template/
- Korean (ko): https://www.hemory.com/ko/blog/workflows/prd-open-questions-assumptions-template/