# How to Keep Open Questions and Assumptions Visible in a PRD

> Use a practical PRD status scheme to separate agreed requirements, proposals, assumptions, and open questions, while tracking evidence and what still needs a decision.

- URL: https://www.hemory.com/blog/workflows/keep-open-questions-assumptions-prd/
- Language: English (en)
- Author: Hemory Team
- Published: 2026-11-26
- Last updated: 2026-11-26
- Summary: Keep a PRD honest by giving each item a clear status: agreed requirement, proposal, assumption, or open question. Record the supporting discussion or evidence, why unresolved items matter, and the next decision needed. A reusable register and worked example show how to avoid turning suggestions into commitments. Hemory can help retrieve context from captured discussions, but the team remains responsible for classification and approval.
- Tags: PRD, product requirements, product management, requirements writing

A PRD can make a suggestion look settled simply by placing it under “Requirements.” That creates confusion when stakeholders review the draft: they may mistake an assumption for a decision or treat an open question as agreed scope. A small set of status labels, paired with evidence and the next decision needed, keeps those differences visible.

## TL;DR

- Label each item as an **agreed requirement**, **proposal**, **assumption**, or **open question**. These statuses describe its state, not its priority.
- Keep the basis, impact, and unresolved decision beside each item. Add an owner or due date only when one has actually been agreed.
- If relevant discussions were captured in Hemory, use its Q&A to help retrieve transcript context; review what the record supports before assigning a status.

## Separate status from priority

Status answers, “What is the current standing of this item?” Priority answers, “How important is it?” A high-priority proposal is still a proposal. Keeping those labels separate prevents urgency from being mistaken for approval.

Use four statuses:

| Status | Use it when | What to record |
|---|---|---|
| **Agreed requirement** | The relevant decision process has accepted the requirement. | Its scope, conditions, and the evidence for the decision. |
| **Proposal** | Someone has suggested an option, but it has not been accepted. | The proposed option and what decision remains. |
| **Assumption** | The draft depends on a premise that has not been validated. | The premise, why the draft relies on it, and what could change if it is wrong. |
| **Open question** | A specific answer or decision is still missing. | The question and how its answer affects scope, behavior, or a next step. |

An assumption and an open question can be related without being the same thing. “Every task has a due date” is an assumption. “What should happen when a task has no due date?” is the question that could test or resolve it. Record both when the draft depends on the premise and the decision is still needed.

## Use a compact register

Put unresolved items in a clearly named section, such as **Open items and assumptions**, or use a status column in the relevant PRD section. A separate register is useful when readers need to scan outstanding decisions; inline labels work when an item needs its context nearby.

A reusable register can use these fields:

| Field | What to include |
|---|---|
| **Status** | Agreed requirement, proposal, assumption, or open question. |
| **Item** | A concise statement of the requirement, proposed option, premise, or question. |
| **Basis** | The relevant discussion, document, evidence, or instruction. Identify it clearly enough to find again. |
| **Impact** | What could change if the item is unresolved or the assumption is wrong. |
| **Next decision or validation** | What needs to be answered or checked. Do not imply that this work is assigned unless it is. |
| **Owner / due date** | Include only when an owner or date has been agreed; otherwise leave it unstated. |

Keep entries focused on decisions that could affect the draft. A register is not a transcript or a list of every idea mentioned. If an answer changes the requirement, update the current status and [retain enough history to explain the change](/blog/searchable-memory/track-requirement-changes/).

## Example: keep the proposal distinct from the requirement

Suppose a product discussion establishes that tasks with a due date should show a reminder before that date. Someone suggests allowing users to snooze the reminder, but the group does not decide whether to include that option. The discussion also leaves unclear what should happen to tasks without a due date.

A PRD register could represent those items like this:

| Status | Item | Basis | Impact or next decision |
|---|---|---|---|
| **Agreed requirement** | For tasks with a due date, show a reminder before the due date. | The discussion established this behavior. | Preserve the stated scope when drafting the requirement. |
| **Proposal** | Allow users to snooze a reminder. | Suggested in the discussion; acceptance was not established. | Decide whether snoozing belongs in scope. |
| **Assumption** | Every task has a due date. | The draft currently relies on this premise; it has not been validated. | If tasks can lack a due date, reminder behavior may need another rule. |
| **Open question** | What should happen when a task has no due date? | No answer is established in the discussion. | Clarify the behavior before treating the related requirement as settled. |

The proposal [does not become a commitment](/blog/searchable-memory/decisions-commitments-and-ideas/) just because it appears beside an agreed requirement. Likewise, the example does not assign someone to resolve the question or invent a deadline. Add those details only if the team agrees them.

## Use captured discussions to recover the basis

If a decision or proposal is unclear in your notes, first identify where the relevant information may already be recorded: a PRD, CRM, notes, transcript archive, or Hemory. If the discussion was captured in Hemory, its [built-in Q&A](/features/) supports multi-turn, transcript-based questions and retrieval across conversation sessions. Ask about the specific requirement or unresolved point, then use the retrieved context to inform the PRD entry.

![Agent session searching a past sync and drafting a follow-up checklist.](/blog-assets/article-images/hemory-memory-qa-agent.webp)

*Retrieve past commitments and draft follow-up tasks.*

Treat retrieved context as evidence to review, not as an automatic status label or proof that every relevant discussion was found. Hemory cannot recover a conversation that was never captured. If the necessary detail has no usable record, consult another available source or ask a focused clarification. The product helps reduce the work of searching and retelling; the team still determines what was agreed and approves the PRD.

## Review the register before sharing the draft

Before sending a PRD for review, scan each requirement for confident wording that depends on an unresolved premise. Check that:

- proposals are not written as accepted requirements;
- assumptions are visible and connected to what could change if they are wrong;
- open questions state what decision or information is missing;
- the basis supports the status you assigned; and
- owners, dates, and approvals appear only when established.

When a question is answered, update the PRD with the decision and its basis. Until then, keep the uncertainty visible rather than filling the gap with plausible-sounding requirement language.

## FAQ

### Should proposals go in the requirements section?

They can appear near the related requirement for context, but label them as proposals and state what remains undecided. Do not present them as part of the accepted scope.

### What is the difference between an assumption and an open question?

An assumption is an unvalidated premise the draft relies on. An open question names the missing answer or decision. A question can test an assumption, and a PRD may need to show both.

### Should every open question have an owner and a deadline?

Only include an owner or deadline when one has been agreed. Otherwise, state the decision or validation needed without assigning responsibility by implication.

### Does a transcript prove that a requirement was approved?

No. A transcript can help recover what was said, but status depends on the decision, its scope, and whether it was accepted. Review the relevant context and follow the team’s decision process before marking a requirement agreed.

## Other language versions

- Japanese (ja): https://www.hemory.com/ja/blog/workflows/keep-open-questions-assumptions-prd/
- Korean (ko): https://www.hemory.com/ko/blog/workflows/keep-open-questions-assumptions-prd/