# How to Check Acceptance Criteria Against the Original Interview

> Spot acceptance criteria that have drifted from interview evidence. Use a simple source check to separate what users said, what the team inferred, and what still needs confirmation.

- URL: https://www.hemory.com/blog/workflows/check-acceptance-criteria-interview-evidence/
- Language: English (en)
- Author: Hemory Team
- Published: 2026-11-25
- Last updated: 2026-11-25
- Summary: Acceptance criteria can sound reasonable while adding conditions users never stated. Look for unsupported specificity, missing qualifications, and assumptions presented as user requirements. Trace each criterion to a relevant interview statement, preserve its context, and label team inferences separately. If an interview was captured in Hemory, its built-in Q&A can help retrieve discussion context; review the source before treating a criterion as traceable.
- Tags: acceptance criteria, user interviews, product requirements, workflows

Acceptance criteria can look precise and testable while quietly adding requirements nobody heard from users. When a team cannot point to the interview behind a condition, it is hard to tell whether the criterion reflects a user need, a reasonable product decision, or an assumption that has gone unchallenged.

## TL;DR

- Watch for specific limits, workflows, and “must” statements with no clear source.
- Compare each criterion with the interview statement and the context around it; do not require verbatim wording, but do preserve meaning and qualifications.
- Label product or engineering inferences separately from what an interviewee actually said. Confirm important gaps instead of filling them in.
- If relevant interviews were previously captured in Hemory, its built-in Q&A can help retrieve discussion context. Treat the response as a lead, then review the source before relying on it.

## Warning signs that a criterion has drifted

A criterion does not need to repeat a user's exact words. Teams often translate a need into observable behavior. The warning sign is a meaningful condition that cannot be explained by the interview evidence or clearly identified as a team decision.

### It adds precision the interview never supplied

A statement such as “I need to know whether the report is ready before I send it” may support a criterion about showing report status. It does not, by itself, establish a particular status label, response time, notification channel, or permission rule. Those details may be sensible design choices, but they are not automatically user requirements.

Look closely at numbers, deadlines, thresholds, device assumptions, and absolute words such as “always” or “only.” Ask what evidence supports each one.

### It turns a preference or example into a universal rule

An interviewee may describe what happened once or what would help in their situation. A criterion can drift when a single example becomes a rule for every user, or when “it would be useful” becomes “the system must.” Check whether the source supports the same strength and scope as the criterion.

### It removes a condition or uncertainty

A user may say a feature is useful only when a particular team, access level, or workflow is involved. If the criterion drops that condition, it may demand behavior beyond the evidence. Likewise, “I might use this if…” is not the same as a firm requirement.

### It attributes the team's solution to the user

An interview may establish a problem without specifying the solution. If a criterion names a particular interface, implementation, or workflow, distinguish the team's proposed response from what the interviewee requested. A solution can still be appropriate; it should not be presented as a direct user statement unless the source supports that attribution.

### No one can identify the source—or the source is only a summary

A backlog note saying “users asked for this” is not enough to establish what they asked for. A short summary may omit a qualification or surrounding exchange. If nobody can identify a relevant interview and statement, mark the source as missing rather than treating repetition in planning documents as proof.

## Trace one criterion back to its source

Use a short evidence check before accepting a criterion as user-backed:

1. **Split the criterion into claims.** Separate distinct behaviors or conditions. A sentence with several “and” clauses may contain requirements with different evidence.
2. **Find the closest interview statement.** Use the interview, transcript, or a reliable record. Note who said it and enough surrounding context to understand the exchange.
3. **Compare meaning and scope.** Does the source support the same user, situation, condition, and level of certainty? The criterion can translate the wording, but it should not silently broaden it.
4. **Classify what the criterion contains.** Mark it as directly supported, a team inference, still to confirm, or unsupported. A useful inference is not a defect when it is labeled and reviewed as one.
5. **Revise or follow up.** Remove unsupported detail, document the team's rationale, or ask a focused question if the distinction affects the product decision.

For example, an interviewee says, “Before I share the report, I need to know whether the numbers are final.” A criterion requiring a visible “Final” status before sharing may be a proposed product interpretation. The interview supports the need to distinguish final from unfinished numbers; it does not establish that exact label or a blocking rule. Keep the interpretation visible for review rather than attributing it to the interviewee.

A compact traceability note can record the criterion, source and context, what is directly supported, and what remains inferred or unresolved. It need not become a separate document if the backlog can hold that information clearly.

## When interviews are in Hemory

If an interview was previously captured in Hemory, its [built-in Q&A](/features/) can answer questions about the user's Memory using transcript-based, multi-turn Q&A across sessions. Ask about the user need or wording relevant to the criterion, then review the source context before recording the evidence. The response can help recover discussion details; it does not automatically link a backlog criterion to a verified source or establish that every assumption has been found.

![Agent session searching a past sync and drafting a follow-up checklist.](/blog-assets/article-images/hemory-memory-qa-agent.webp)

*Retrieve past commitments and draft follow-up tasks.*

If the interview was not captured there, or the necessary statement is not available, use another reliable record or [ask a focused follow-up](/blog/searchable-memory/clarify-a-past-conversation/). A tool cannot reconstruct an exchange it never received. The team still decides whether an inference is appropriate and who must confirm it.

## FAQ

### Does an acceptance criterion need to quote the interview verbatim?

No. It should preserve the source's meaning and scope, not necessarily its wording. Make any added product or technical interpretation visible rather than presenting it as a direct user requirement.

### What if the criterion is reasonable but no interview supports it?

Keep it only if the team has another valid basis for it, such as a product decision or technical constraint, and label that basis accurately. If its status matters to the decision and no basis is available, leave it unresolved or seek clarification.

### Can a summary prove that a criterion came from an interview?

A summary can help locate or understand a discussion, but it may omit qualifications. For consequential criteria, compare the summary with the underlying source when available and record the relevant context.

## Close the evidence gap before treating a criterion as user-backed

When a criterion sounds plausible but its source is unclear, separate what the interview supports from what the team has added. That makes assumptions easier to review and gives product and engineering a clearer basis for deciding what to build. Previously captured interview context can reduce the work of reconstructing the discussion, but the team remains responsible for judging and confirming the requirement.

## Other language versions

- Japanese (ja): https://www.hemory.com/ja/blog/workflows/check-acceptance-criteria-interview-evidence/
- Korean (ko): https://www.hemory.com/ko/blog/workflows/check-acceptance-criteria-interview-evidence/
